Projektdetails
In the course of the new construction of the paper machine PM1, SCHUSTER engineering planned the complete infrastructure.
- Access road with logistics areas, including sewer and hydrant network
- Wood storage area with 34.000 m²
- Railway connection for finished goods storage, stock preparation, pulp storage and timber storage area with a length of approx. 3.5 km and several switches
- Outdoor facilities with infiltration and planting